EV Support Installs First Eaton Pow-R-Stations at Eaton’s Auburn Satellite Plant

Go Back To Recent Blog Posts
Sep 11, 2011

Back in August we attended an open house at Eaton Corp’s Auburn facility and checked out their prototype Level II charging station, the Pow-R-Station, as well as the Mitsubishi iMiev that they have been taking around the country. Since then we have become an Eaton Certified Contractor and were chosen to install the first charging equipment at the Auburn plant located at 1604 15th St SW Suite 114, Auburn, WA. The two units are shown in the picture at the parking lot in front of the plant.

Avatarwp-user-avatar wp-user-avatar-original photo

About The Author - Jeremy Smithson

Started Puget Sound Solar in 2001 with 30 years of construction contracting experience, and a desire to turn Seattle on to solar energy. Achieving NABCEP certification in 2004, Jeremy believes that our customers often follow a path similar to the one he took, starting out with solar daydreaming, then progressing to education on the subject, and eventually leading to action. In addition to leading the company he also does some teaching and speaking engagements about various aspects of solar energy, and experiments relentlessly with various solar, energy efficiency, and electric vehicle projects.

Other News

Go Back To Recent Blog Posts

Free Quote

    To expedite your quote, it's helpful to attach the following files:
    (Note that the file size limit is 25MB.)

    1) A clear photo of the inside of your electrical panel including the inside door.

    2) A photo of the wall with the electrical panel from about 10 feet away.

    3) A photo of the area where you'd like the EV charger installed.