Design, Installation and Electrical Work

Design

We do site assessments, load calculations, and electrical design for every situation, from a single charging station for a single-family home to a parking garage full of charging stations for a fleet of vehicles.

Most often we are connecting these charging stations to an existing electric service, so we will do the necessary calculations to determine that there is sufficient capacity in that service to handle the additional load of car charging.

For a single-family residence, the process is usually simple; some basic information about the location of the circuit breaker panel and where the charging station will go, along with photos of the breaker panel, is often enough for us to create an accurate quote. If there is a detached garage or some distance from the circuit breaker panel to the charging location, we will schedule a site visit to gather the details. For a multi-family building a visit to the site is almost always required. There are many different situations that we encounter in these buildings, so there is no one-size-fits-all solution and each installation requires some design work. In many cases, we can do these for free but sometimes there are enough complications to warrant negotiation of a fee for design service.

Commercial and government locations also require a site visit and are of similar complexity to multifamily buildings. We will work with the owner to identify the most cost-effective solutions that take into consideration tenant and customer parking situations, location of the electric service, goals of the building owner and occupants, and possible future expansion of EV charging.

Networked charging stations that use 4G cell signals require assessment of signal strength, and we do those measurements using a Squid cell signal strength meter that finds all the cell signals at any location. If a signal booster is required, we provide the design of the booster system including antennas, cables, and amplifiers.

Installation

Our EVSE installation crew has experience with all types of charging stations and situations. We are familiar with all the applicable codes and standards so that our customers always get a high quality, safe installation. We are a General Contractor as well as an Electrical Contractor so we typically do all the work in-house unless the customer wants to handle the non-electrical work separately.

If there are any surprises encountered during the installation process that require a change in the scope of work, we will get a written change order before proceeding.

Some of the tasks that we perform in addition to the electrical work are:

Drywall cutting and patching
Minor carpentry work
Moving and replacing insulation
Trenching and backfilling
Concrete cutting and patching
Wheel stops and safety bollards
Signage and parking space painting

Electrical work

If there is additional electrical work needed to facilitate the addition of a charging station, our electricians can provide that. We can also provide incidental electrical work such as the addition of lighting, and other circuits.

Some things that may be needed besides the charging station and its circuit:

Circuit breaker replacement to provide more room in a panel
Electric panel replacement for safety or other reasons
Electric service upgrade to provide additional capacity
Addition of a sub panel to accommodate the EV circuit
Required corrective work such as grounding
Transformers and dedicated electric panels

Free Quote

    To expedite your quote, it's helpful to attach the following files:
    (Note that the file size limit is 25MB.)

    1) A clear photo of the inside of your electrical panel including the inside door.

    2) A photo of the wall with the electrical panel from about 10 feet away.

    3) A photo of the area where you'd like the EV charger installed.