{"id":4618,"date":"2022-03-17T06:37:39","date_gmt":"2022-03-17T06:37:39","guid":{"rendered":"https:\/\/evsupport26.mysites.io\/?p=4618"},"modified":"2026-03-09T23:10:18","modified_gmt":"2026-03-09T23:10:18","slug":"curbside-level-2-charging-in-seattle","status":"publish","type":"post","link":"https:\/\/evsupport.com\/?p=4618","title":{"rendered":"Curbside Level 2 Charging In Seattle"},"content":{"rendered":"\n<p class=\"has-medium-font-size wp-block-paragraph\"><a href=\"https:\/\/www.seattle.gov\/city-light\/\" target=\"_blank\" rel=\"noreferrer noopener\">Seattle City Light<\/a>, (SCL) is seeking input on a&nbsp;<a href=\"https:\/\/www.seattle.gov\/city-light\/in-the-community\/current-projects\/curbside-level-2-ev-chargingutm_sourceadandutm_mediumonlineandutm_campaigncurbside_opt_in-\" target=\"_blank\" rel=\"noreferrer noopener\">new program offering curbside Level 2 EV charging<\/a>&nbsp;in locations where residents cannot access off-street parking for their EV\u2019s. <\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"223\" src=\"https:\/\/evsupport.com\/wp-content\/uploads\/2022\/05\/2022-05-17-Seattle-City-Light-logo-1024x223.png\" alt=\"\" class=\"wp-image-1641\" srcset=\"https:\/\/evsupport.com\/wp-content\/uploads\/2022\/05\/2022-05-17-Seattle-City-Light-logo-1024x223.png 1024w, https:\/\/evsupport.com\/wp-content\/uploads\/2022\/05\/2022-05-17-Seattle-City-Light-logo-300x65.png 300w, https:\/\/evsupport.com\/wp-content\/uploads\/2022\/05\/2022-05-17-Seattle-City-Light-logo-768x167.png 768w, https:\/\/evsupport.com\/wp-content\/uploads\/2022\/05\/2022-05-17-Seattle-City-Light-logo.png 1350w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\">SCL needs your feedback by May 27th, so if you\u2019re interested please&nbsp;<a href=\"https:\/\/www.surveymonkey.com\/r\/curbside-ev\" target=\"_blank\" rel=\"noreferrer noopener\">go their survey<\/a>&nbsp;so your input can be included in their decision-making process.<\/p>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Similar programs have been piloted in Los Angeles and the following YouTube video shows an example of how utility pole chargers work in Melrose, Massachusetts.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"Utility Pole Level 2 EV Charging: Winter Update + Expansion Plans\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/3WzMyfoS4FA?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Charger locations will be selected based on the following criteria \u201cCity Light will select charger locations through an opt-in process. Residents can request a charger in front of their homes if the location meets the program requirements. City Light will evaluate each request based on predefined criteria and choose the locations that best support the equity and environmental goals of the Transportation Electrification Strategic Investment Plan. The utility will solicit input from neighboring property owners for each proposed location. City Light will not install the charging station if more than 50% of the neighboring property owners voice opposition.\u201d<\/p>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\">If you do need an EV charging station installed at your home, multi-family residence, business or governmental location, please fill out our contact form below and tell us a little about your project.<\/p>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Leading The Charge.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Seattle City Light, (SCL) is seeking input on a&nbsp;new program offering curbside Level 2 EV charging&nbsp;in locations where residents cannot access off-street parking for their EV\u2019s. SCL needs your feedback by May 27th, so if you\u2019re interested please&nbsp;go their survey&nbsp;so your input can be included in their decision-making process. Similar programs have been piloted in&hellip;<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-4618","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/evsupport.com\/index.php?rest_route=\/wp\/v2\/posts\/4618","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/evsupport.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/evsupport.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/evsupport.com\/index.php?rest_route=\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/evsupport.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4618"}],"version-history":[{"count":0,"href":"https:\/\/evsupport.com\/index.php?rest_route=\/wp\/v2\/posts\/4618\/revisions"}],"wp:attachment":[{"href":"https:\/\/evsupport.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4618"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/evsupport.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4618"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/evsupport.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4618"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}