EV Support Installs First Level II Chargepoint America EVSE in Bellevue

Go Back To Recent Blog Posts
Nov 19, 2010
electric-car-charging-stations-for-sale

Charge NW and EV Support teamed up to put two Chargepoint America Level II public charging stations in Bellevue City Hall on November 10th, 2010.  The two Coulomb CT-2103 dual stations each have Level I and Level II charging at the same time from the same unit.

A dedication was held November 19th and was attended by Bellevue Mayor Dr. Don Davidson, Coulomb’s ChargePoint America Director Michael Jones, PSE Vice President of Corporate Affairs, Andy Wappler, Kemper Development Company Glenn Bachman and some City Council members and staff as well as congressman Jay Inslee.

Coulomb’s ChargePoint America program will provide 4,600 FREE charging stations in nine regions in the United States: Austin, Texas, Detroit, Los Angeles, New York, Orlando, Fla., Sacramento, Calif., the San Jose/San Francisco Bay Area, Bellevue/Redmond, Wash., and Washington DC and is a strategic partnership between Coulomb and three leading automobile brands: Ford, Chevrolet and Smart USA. Coulomb currently has the largest established base of networked charging stations worldwide with more than 850 units shipped to more than 200 customers. Installation of the ChargePoint charging stations is underway now in all nine regions.

Avatarwp-user-avatar wp-user-avatar-original photo

About The Author - Jeremy Smithson

Started Puget Sound Solar in 2001 with 30 years of construction contracting experience, and a desire to turn Seattle on to solar energy. Achieving NABCEP certification in 2004, Jeremy believes that our customers often follow a path similar to the one he took, starting out with solar daydreaming, then progressing to education on the subject, and eventually leading to action. In addition to leading the company he also does some teaching and speaking engagements about various aspects of solar energy, and experiments relentlessly with various solar, energy efficiency, and electric vehicle projects.

Other News

Go Back To Recent Blog Posts

Free Quote

    To expedite your quote, it's helpful to attach the following files:
    (Note that the file size limit is 25MB.)

    1) A clear photo of the inside of your electrical panel including the inside door.

    2) A photo of the wall with the electrical panel from about 10 feet away.

    3) A photo of the area where you'd like the EV charger installed.